Special features
Surrounding, freely cantilevered terrace - modern, minimalist look, width: 1.60 m
Area of the floating roof construction: 46 x 21 m, cantilever of 9.30 m as roofing for the grandstand, cantilever of the rear side: 3 m, visible, powder-coated steel construction
Hydraulically tiltable floodlight masts
Irrigation systems: 1x natural grass, 1x artificial grass, efficient drainage system
Thermal solar plant - photovoltaics
Heating via district heating pipe / biogas plant
Grandstand with 132 folding seats
Facts and figures
- Building owner: Municipality Parc Hosingen
- Concept: TR-Engineering
- Architect: Decker, Lammar & Associés S.A.
- General contractor: Jointed management by IBB Baugesellschaft (canteen, dressing rooms, grandstand) + Karp-Kneip Constructions S.A. (pitches, parking)
- Building area: 1.679 m²
- Building volume: 2.531 m³
- Completion: 2020